1265 Borregas

The 1265 Borregas project showcases Google’s commitment to sustainability and innovation, bringing to life a cutting-edge, all-electric, 5-story office building in Sunnyvale, California. Designed as a mass timber and steel hybrid facility, the structure integrates modern aesthetics with advanced engineering to achieve LEED Platinum certification.

Project Details

Project Owner:

Google

Contractor:

XL Construction

Steel Tonnage:

940 tons

Location:

Sunnyvale, CA

Schuff Services: BIM, Project Management, Steel Detailing, Connection Design, Steel Fabrication, and Steel Erection

Project Overview

Schuff Steel played a critical role in the project, providing fabrication and erection of 940 tons of structural steel. The scope of work included Buckling-Restrained Braces (BRBs), Architecturally Exposed Structural Steel (AESS), decking, stairs, and a comprehensive miscellaneous work package. The dynamic facade, featuring automated wood shades, reduces solar heat gain and adjusts throughout the day to optimize occupant comfort, while a photovoltaic (PV) system powers the building and supplies surplus energy to the grid, emphasizing its net-positive energy goals.

A key challenge of the project was achieving precise multi-trade coordination, especially during erection sequencing, to seamlessly integrate the structural steel components with the mass timber and other trades. Schuff Steel’s expertise ensured that all elements aligned to meet the demanding schedule and rigorous quality standards of this innovative facility.

This project highlights the intersection of sustainability, design, and technical precision, contributing to the evolving architectural landscape of Sunnyvale and setting a new benchmark for environmentally conscious office buildings.

Let’s talk about
you next project

    1265 Borregas

    Project Details

    Project Owner:

    Google

    Contractor:

    XL Construction

    Steel Tonnage:

    940 tons

    Location:

    Sunnyvale, CA

    Schuff Services: BIM, Project Management, Steel Detailing, Connection Design, Steel Fabrication, and Steel Erection

    The 1265 Borregas project showcases Google’s commitment to sustainability and innovation, bringing to life a cutting-edge, all-electric, 5-story office building in Sunnyvale, California. Designed as a mass timber and steel hybrid facility, the structure integrates modern aesthetics with advanced engineering to achieve LEED Platinum certification.

    Schuff Steel played a critical role in the project, providing fabrication and erection of 940 tons of structural steel. The scope of work included Buckling-Restrained Braces (BRBs), Architecturally Exposed Structural Steel (AESS), decking, stairs, and a comprehensive miscellaneous work package. The dynamic facade, featuring automated wood shades, reduces solar heat gain and adjusts throughout the day to optimize occupant comfort, while a photovoltaic (PV) system powers the building and supplies surplus energy to the grid, emphasizing its net-positive energy goals.

    A key challenge of the project was achieving precise multi-trade coordination, especially during erection sequencing, to seamlessly integrate the structural steel components with the mass timber and other trades. Schuff Steel’s expertise ensured that all elements aligned to meet the demanding schedule and rigorous quality standards of this innovative facility.

    This project highlights the intersection of sustainability, design, and technical precision, contributing to the evolving architectural landscape of Sunnyvale and setting a new benchmark for environmentally conscious office buildings.

    Let’s talk about
    you next project